Estimated reading time: 0 minutes, 24 seconds

Epic Cost Overruns for Arizona Health Network

The University of Arizona Health Network, the largest health network in Tucson, is reporting a $28.5 million dollar operating loss. So reports the Arizona Daily Star.

The network blames a majority of the deficit on the costs associated with implementing their new electronic medical record system. The system from Epic, costs an estimated $115 million, including $32 million in unbudgeted costs due to a delay in going live with the system that required additional training and support.

Read the full article from Arizona Daily Star

Read 5276 times
Rate this item
(0 votes)

Visit other PMG Sites: